top of page
MILLIS
Middle/ High School Construction Project
Preliminary design options were included in the April 2024 Preliminary Design Program (PDP) report to the MSBA which can be found below
bottom of page
Preliminary design options were included in the April 2024 Preliminary Design Program (PDP) report to the MSBA which can be found below